Just back from Hausmann’s. The access road has been built up with a heavy base and is now wide/two-way for heavy truck traffic. Parking lot has a gas well pad at the far end, and fracking is going on now. Lots of water truck activity in/out and at the pad. The pad road runs along the west side of the parking area. Ernie told me the 16/12/10/8 bore course is down below and along side the hill, and no shooting on top of the hill due to the gas pad activity. 8 stations for the Hunter events and 13 for the Main on Saturday. Also, no change to the 20 and smaller gauge course beyond the 5 stand. I didn’t ask for pricing. Camper parking is on the left in the field coming in from the paved road. Barnett and Cobb are already set up and other vendors were arriving as I left. This is all I have to report.
|