 |
|
 |
|
 |
|
 |
| Notices |
Welcome to the new PGCA Forum! As well, since it
is new - please read the following:
This is a new forum - so you must REGISTER to this Forum before posting;
If you are not a PGCA Member, we do not allow posts selling, offering or brokering firearms and/or parts; and
You MUST REGISTER your REAL FIRST and LAST NAME as your login name.
To register:
Click here..................
If you are registered to the forum and keep getting logged
out: Please
Click Here...
Welcome & enjoy!
To read the Posts, Messages & Threads in the PGCA Forum, you must be REGISTERED and LOGGED INTO your account! To Register, as a New User please see the Registration Link Above. If you are registered, but not Logged In, please Log in with your account Username and Password found on this page to the top right.
Hi Unregistered,
On July 29th, this site will be moving..! No, really - it's "moving" to another physical location - including servers, gateways, routers - everything - including my coffee cup...
So, from the date of July 29th through July 30 or 31 (shooting for these dates, but - as always, I'm at the mercy of my ISP who has to install the lines to the new location - and we actually get them running ;) ). But - this site, cloud servers and main web will be OFF LINE.
Now, please save these dates!! Please - don't be "that guy" who emails me on the 30th to tell me you "can't open the Parker Website". I'll already know it is offline - and also know that you are "that guy"...
I'll take this notice up and down over the next week or so - and leave it up during the final few days before shutting it off on the 29th..
John D.
|
 |
 |
|
 |
08-14-2011, 06:53 AM
|
#1
|
Member
|
|
|
Member Info
|
Join Date: Jun 2009
Posts: 3,168
Thanks: 2,029
Thanked 5,769 Times in 1,593 Posts
|
|
I used to going hiking with my daughter when she was little on some abandoned lines (and a few active) of the old Boston & Maine RR. We use to look for and collect date nails in the ties. Date nails were used to date the age of wooden ties so that various methods of wood preservation could be determined. The B&M stopped using date nails in the 60's. I can't recall the oldest one I found, definitely have some from the 20's, maybe a few from the teens.
I have not seen a date spike in a tie plate so that may be a unique practice on the RR that ran through your area.
The poundage on the rail is the weight per yard. 85lb is light rail by todays standards. As trains got bigger rail weight got heavier. Lighter rails is still used on sidings and yards where trains are moving slow. I think the standard wieght today on continous welded rail is 139lb. Todays trains can still operate on 85lb rail but they will be going slow.
Along with the Steel Company name you will often see month and year the steel rail was produced. Older rail might be 10 1923 for October 1923 and newer rail might be I I I I 1999for April 1999.
In 2001 the new owners of the B&M mainline completely replaced the rails, most ties and added more stone to the entire line from Boston to Portland Maine. This was done to allow for high speed Amtrak service, 79mph. I was surprised to find a tie in the mainline after this was done with 1925 date. Like our guns the nail was in interesting time traveler to me.
It will be a sad day when we see rails stamped "Bejing Steel and Foundry I I I I I 2011"
|
|
|
|
The Following 7 Users Say Thank You to Pete Lester For Your Post:
|
|
|
 |
|
 |
08-14-2011, 10:14 AM
|
#2
|
Member
|
|
|
Member Info
|
Join Date: Jun 2009
Posts: 1,817
Thanks: 870
Thanked 2,402 Times in 664 Posts
|
|
Thanks Pete: Interesting info. To clarify, the rail plate itself had the molded date on it. I did see the vertical month codes I I I I ...... I'll have to have another look for a numeric month code. Also interesting about the pounds/yard figure and that 85 is considered light today and a train would not be moving very fast on those rails. I have only witnessed a couple trains travelling that line. Speed was not a factor !! The first one was heard long before seen. It was crawling along. I first heard the "whistle" at some great distance and continued to hear it at fairly long intervals. There is a turn in the line about 5 miles from where we hike. Finally saw the train and thought we better remove ourselves from the right of way. We continued the hike in the stubble field. The train finally rolled by. Had a wave to the engineer and he back. But for the noise, we could have had a short conversation. He was taking cars to an elevator to take on a load of peas. I only know that because the next day, there was a continuous line of split peas in the snow along the rails. I wondered how much food was lost due to a leaking car.
One thing about this forum - there is a wide life experience knowledge base to shed light on many subject areas, including rail tie nails
Cheers,
Jack
__________________
Hunt ethically. Eat heartily.
|
|
|
|