View Single Post
Unread 07-13-2021, 12:26 PM   #2
Member
joe breda
Forum Associate

Member Info
 
Join Date: Sep 2012
Posts: 62
Thanks: 0
Thanked 220 Times in 31 Posts

Default

In the past 7 years I’ve done some pretty extensive work on the Parker Ejector System.
I may be able to help you out some. Your ideal if welding and refitting may be a viable solution. That part pictured doesn’t look quite right !
It’s missing the adjacente sear.
I have had parts welded before with success.
And I also re manufacture the Ejector Hammers both left and right. If your are also in need for them, let me know. I just CNC machining a lot of 23 right hand ones ( which seem to break most often). Or give me a call and we can talked about the dilemma your in.
661-902-1602 I’ll try to attach a picture of what the two parts look like together.
Attached Images
File Type: jpg BFA9DBBC-191C-4877-926F-F5E2B274A14F.jpg (514.4 KB, 5 views)
joe breda is offline   Reply With Quote
The Following 5 Users Say Thank You to joe breda For Your Post: