Quote:
Originally Posted by Mark Ouellette
Charlie,
Load #90 calls for x10x2 (space) 1/4" filler MR. That is two x10x gas seals and 1/4" of filler (1/4" tall section of a 16 gauge fiber wad) and a mylar wrap
Mark
|
I read it differently, (1) x10x and (2) 1/4" filler plus MR (it would seem 1 1/2" filler wad would work just as well). I don't see the point of using more than one gas check. Load 78 would require 3 gas check/seals???