View Single Post
Unread 10-19-2011, 05:51 PM   #12
Member
Richard Flanders
PGCA Lifetime
Member
 
Richard Flanders's Avatar

Member Info
 
Join Date: Nov 2008
Posts: 4,517
Thanks: 8,480
Thanked 5,538 Times in 1,717 Posts

Default

"Between the wars" would be correct for these. They would have been in place prior to 1934 when the hydro was put in place. After that, they ran 2 dredges at the same time on the hydro system, which was run at 800kW with a 1.1mW capability. I'll put in a shot of the generator in the hydro power house, which was used until late in 1989 I think. Pics show the genset, flywheel, and the Pelton wheel housing. The Pelton is fed through a 5ft? diameter wooden pipe with 70ft of fall. Pipe made of incredible clear fir I think, or cedar. I'll add a pic of that and the penstock
Attached Images
File Type: jpg IMG_9439 mail.jpg (123.3 KB, 0 views)
File Type: jpg IMG_9442 mail.jpg (103.8 KB, 1 views)
File Type: jpg IMG_1506 mail.jpg (182.5 KB, 1 views)
File Type: jpg IMG_9443 pelton wheel mail.jpg (179.0 KB, 1 views)
Richard Flanders is offline   Reply With Quote